Research on the Application of TOPSIS Method in EPC Risk Assessment

Liu Yue *

School of Civil and Transportation, North China University of Water Resources and Electric Power, Zhengzhou-450045, Henan, China.

*Author to whom correspondence should be addressed.


Abstract

TOPSIS method, as a relatively new comprehensive evaluation method for multi-objective decision making, makes use of the proximity between the evaluation object and its ideal target to rank the relative advantages and disadvantages, and is a comprehensive evaluation method for intra-group distance. This method is often combined with risk identification technology in the field of risk assessment, which can accurately reflect the gap between evaluation schemes, correctly identify risks, assess risks and scientifically control risks, reduce adverse effects and improve management level, so it is widely used in the engineering field. As the infrastructure construction tends to be saturated and the industry competition becomes increasingly fierce, the project construction mode is gradually changing from the traditional mode to the EPC mode. EPC projects have the characteristics of large construction scale, many personnel and mixed technologies, and are faced with complex risk factors in the construction process. Therefore, it will become a trend to explore the better integration of EPC projects and TOPSIS method. This paper mainly discusses the advantages and disadvantages of TOPSIS method, research status and applicability with EPC, proposes my own views on the improvement of TOPSIS method in EPC projects, and looks forward to its future research direct0069on in the field of risk assessment, so as to provide references for the integration and improvement of EPC projects and TOPSIS method.

Keywords: Risk assessment, EPC, combinatorial empowerment, MCDM


How to Cite

Yue, L. (2024). Research on the Application of TOPSIS Method in EPC Risk Assessment. Journal of Engineering Research and Reports, 26(3), 224–231. https://doi.org/10.9734/jerr/2024/v26i31107

Downloads

Download data is not yet available.

References

Svetlana Borukhova. Engineering risk management [J]. Green Processing and Synthesis. 2014;3(1):97-98.

Saretz B, Friedli T .Integrating Risk into the Analysis [J]. Zeitschrift für wirtschaftlichen Fabrikbetrieb. 2024;119(1-2):41-47.

Lv LL. Thinking on financial risk Management of EPC project [J]. CO-Operative Economy & Science. 2023(5):138-140. (in Chinese)

Hwang CL, Yoon KS. Multiple Attribute Decision Making [M]. Berlin: Springer Verlag; 1981.

Abbas Mardani, Ahmad, et al. Application of multiple-criteria decision-making techniques and approaches to evaluating of service quality: A systematic review of the literature [J]. Journal of Business Economics & Management. 2015;16(5):1034-1068.

Yap L Y J, Ho CC, Ting C. A systematic review of the applications of multi-criteria decision-making methods in site selection problems[J]. Built Environment Project and Asset Management. 2019;9(4):548-563.

Liu Y. Application of TOPSIS Comprehensive Evaluation Method in risk assessment [J]. Henan Building Materials. 2024(3):12-15. (in Chinese)

Ting HX, Min HL. Assessment of vulnerability to waterlogging in subway stations using integrated EWM-TOPSIS [J]. Smart Construction and Sustainable Cities. 2023;1(1):1-17.

Zhang YF, Ng, et al. Identification and Quantification of Node Criticality through EWM–TOPSIS: A Study of Hong Kong’s MTR System [J].Urban Rail Transit,2021,7(3):1-14.

Wang Y, Qiu M, Shi LQ. A GIS-based Model of Potential Groundwater Yeld Zonation for A Sandstone Aquifer based on the EWM and TOPSIS Methods[C]. //Proceedings of the IMWA 2019 Conference - "Mine Water: Technological and Ecological Challengese: 15-19 July 2019, Perm, Russia: International Mine Water Association. 2019;387-393.

Jimin H, Mei Y, Bobo L, et al. Research on the Optimization for Acidification Modification Scheme Considering Coal's Wettability Based on the AHP-TOPSIS Method [J]. ACS Omega. 2023,8(36): 32667-32676.

Sur, Gokhan, Erkan, Omer. Surface quality optimization of CFRP plates drilled with standard and step drill bits using Taguchi, TOPSIS and AHP method[J]. 2021,38(5): 2163-2187.

Brototi B, Abhishek G, Lalengliana BS. Spring water suitable and vulnerable watershed demarcation using AHP-TOPSIS and AHP-VIKOR models: study on Aizawl district of North-Eastern hilly state of Mizoram, India[J].Environmental Earth Sciences. 2023;82(3).

Xing RN, Hui BX, Yang J, et al. The Post Ability Evaluation of Maintenance Personnel Based on the G1-Topsis Algorithm [J].Applied Mechanics and Materials. 2013;2560(347-350):3051-3055.

Qingqi Zhao, Changle Yu, Jun Liu, et al. The techno-economic evaluation of school integrated energy system based on G1-anti-entropy weight-TOPSIS method [J]. IOP Conference Series: Earth and Environmental Science. 2021;675(1): 1755-1315.

Feng Y, Jun S, Yu yun W, et al. A novel method for the performance evaluation of institutionalized collaborative innovation using an improved G1-CRITIC comprehensive evaluation model [J]. Journal of Innovation Knowledge. 2023; 8(1):100289.

Kabirifar, Kamyar, Mojtahedi et al. The impact of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project [J]. Buildings. 2019;9(1):15.

Jahantigh, Farzad F, malmir, Behnam, Avilaq, Behzad Aslani. Economic risk assessment of EPC projects using fuzzy TOPSIS approach [J]. International Journal of Industrial and Systems Engineering: IJISE. 2017;27(2):161-179.

Peyman N, Rayati M D, Sirous G. Classification, prioritization, efficiency, and change management of EPC projects in Energy and Petroleum industry field using the TOPSIS method as a multi-criteria group decision-making method [J]. AIMS Energy. 2020,8(5):918-934.

Yang X, Duan S .Research on Supplier Selection of Epc Project Based on Fuzzy Topsis [C] // Research Institute of Management Science and Industrial Engineering. Proceedings of 2017 3rd International Conference on Innovation Development of E-commerce and Logistics (ICIDEL 2017). China: Management and engineering Department, Zhengzhou University. 2017;6:147-152.